Optimise, Oxford (Thames Water)

Wherever, whenever, you need us, we’re there.

At this remote location, operated by Thames Water, contracting firm, Optimise, work from a site that requires generator power for five cabins, a drying room, a canteen, several storage units and LED flood lighting. However, the actual power requirements of the site are quite low, so our consultants were able to come up with a solution by deploying a 9kw Hussh Pod, which discharges to 50%, powering the site for up to 16 hours each day. This means that the site is powered for most of the day without the need to burn diesel.

The savings to our client are somewhere in the region of 3840 litres of diesel each month and over ten tons of CO2. Again, problems associated with overuse have been eliminated and fuel deliveries have decreased by 70%.