Case Study

Construction

Solution
Hussh Pod 150/150
Generator
250kVA
Term
One Month
£11,693

Fuel Saved

30,987kg

CO2 Reduced

562 hours

Generator Runtime Reduced

Significantly reducing generator run-time by 562 hours in just one month.
Construction

THE CHALLENGE

Our construction client needed to reduce their CO2 emissions and fuel costs by running their site on battery power for as long as possible, without compromising on performance.

THE SOLUTION

Our team assessed the client’s on-site power demands before recommending an optimised solution that was appropriate for the application. Alongside a 250kVA generator, we proposed our Hussh Pod 150/150 – 150kWh of useable energy storage with 150kW three-phase inverters.

THE RESULTS

The integration of the Hussh Pod into the client’s power set up reduced generator run time over the hire period by 562 hours, saving the client £11,693 in fuel costs and reducing CO2 emissions by 30,987kg.

Over the period, the site ran 76% on battery power leaving only 24% on the generator.

As part of the Power Saving Solutions service, reporting was sent to the client to demonstrate performance, savings and return on investment.

Statistics based on a comparison of using a sole traditional 250kVA diesel generator, at a cost of £1.60/L at 13L per hour.