Case Study

Construction

Solution
Hussh Pod 30/45
Generator
60kVA
Term
6 months
£30,252

Fuel Saved

66,554kg

CO2 Reduced

2,801 hours

Generator Runtime Reduced

The site has ran 63% on battery, leaving only 37% on the generator.
Construction

THE CHALLENGE

Our construction client in County Laois needed to reduce their CO2 emissions and fuel costs by running their site on battery power for as long as possible, without compromising on performance.

THE SOLUTION

Our team assessed the client’s on-site power demands before recommending an optimised solution that was appropriate for the application. Alongside a 75kVA generator, we proposed our Hussh Pod 30/45 – 45kWh of useable energy storage with 30kVA three-phase inverters.

THE RESULTS

The integration of the Hussh Pod into the client’s power set up reduced generator run time over the hire period by 2,801 hours, saving the client £30,252 in fuel costs and reducing CO2 emissions by 66,554kg.

Over the period, the site has ran 63% on battery, leaving only 37% on the generator.

As part of the Power Saving Solutions service, reporting was sent to the client to demonstrate performance, savings and return on investment.

Statistics based on a comparison of using a sole traditional 75kVA diesel generator, at a cost of £1.20/L at 9L per hour.