THE CHALLENGE

Our construction client in East London needed to reduce their CO2 emissions and fuel costs by running their site on battery power for as long as possible, without compromising on performance.

THE SOLUTION

Our team assessed the client’s on-site power demands before recommending an optimised solution that was appropriate for the application. Alongside a 75kVA generator, we proposed our Hussh Pod 10/20 – 20kWh of useable energy storage with 10kVA single-phase inverters.

THE RESULTS

The integration of the Hussh Pod into the client’s power set up reduced generator run time over the hire period by 5,688 hours, saving the client £58,019 in fuel costs and reducing CO2 emissions by 90,100kg.

Over the period, the site has ran 75% on battery, leaving only 25% on the generator.

As part of the Power Saving Solutions service, reporting was sent to the client to demonstrate performance, savings and return on investment.

Statistics based on a comparison of using a sole traditional 50kVA diesel generator, at a cost of £1.70/L at 6L per hour.