Our construction client needed to reduce their CO2 emissions and fuel costs by running their site on battery power for as long as possible, without compromising on performance.
Our team assessed the client’s on-site power demands before recommending an optimised solution that was appropriate for the application. Alongside a 250kVA generator, we proposed our Hussh Pod 150/150 – 150kWh of useable energy storage with 150kW three-phase inverters.
The integration of the Hussh Pod into the client’s power set up reduced generator run time over the hire period by 1,574 hours, saving the client £69,649 in fuel costs and reducing CO2 emissions by 105,458kg.
Over the period, the site has ran 64% on battery, leaving only 36% on the generator.
As part of the Power Saving Solutions service, reporting was sent to the client to demonstrate performance, savings and return on investment.