Case Study

Construction

Solution
Hussh Pod 60/100
Generator
60kVA
Term
1 month
£7,454

Fuel Saved

12,300kg

CO2 Reduced

517 hours

Generator Runtime Reduced

Reduced generator run time over the hire period by 517 hours.
Construction

THE CHALLENGE

Our construction client in Leeds needed to reduce their CO2 emissions and fuel costs by running their site on battery power for as long as possible, without compromising on performance.

THE SOLUTION

Our team assessed the client’s on-site power demands before recommending an optimised solution that was appropriate for the application. Alongside a 60kVA generator, we proposed our Hussh Pod 60/100 – 100kWh of useable energy storage with 60kVA three-phase inverters.

THE RESULTS

The integration of the Hussh Pod into the client’s power set up reduced generator run time over the hire period by 517 hours, saving the client £7,454.82 in fuel costs and reducing CO2 emissions by 12,300.46kg.

Over the month period, the site has ran 70% on battery, leaving only 30% on the generator.

As part of the Power Saving Solutions service, reporting was sent to the client to demonstrate performance, savings and return on investment.

Statistics based on a comparison of using a sole traditional 60kVA diesel generator, at a cost of £1.60/L at 9L per hour.