Huge Reductions Already at HS2 in London

Posted on 24th August 2022 by in Construction Sites, Hybrid Generator

The Hussh Pod 30/45 Hybrid Generator might be flying high in this photo taken by one of our engineers at the HS2 construction site in London, but the clients fuel bill certainly isn’t going to be as high! In less than 3 weeks they’ve:

💸 Saved £4,116
🏭 Made a CO2 Reduction of 5,054kg

Whilst the cost of everything from materials to fuel are rising, at Power Saving Solutions we’re helping companies save money and meet carbon reduction targets – Get in touch to see how we can help you.