Belfast – Construction

Case Study

 

Hussh Pod 30/45
Hussh Pod 30/45

Site Overview

We deployed 4 30/45 Hussh Pods for this project in the Titanic Quarter in Belfast. The Hussh Pods were used to power aviation lights overnight which is a crucial part of any construction project. The Hussh Pods operated from January through to August, until the site was on mains grid power. 

The site operated on Hussh Pod battery for 69% of the time available with the generator running for the remaining 31%.

Innovation and Sustainability

This has resulted in approximately 78,386 litres of fuel being saved at a value of £117,629 with a reduction of 207,029kg of CO2 compared to when running solely on a diesel generator.

 

Titanic Quarter
Titanic Quarter

Our Client Hired:

4 30/45 Hussh Pod Battery Energy Storage Units

Powering:

Aviation Lights

78,386 Litres

Fuel Saved*

£117,629

Money Saved*

207,029kg

CO2 Reduction*
*These figures are approximate and based on the generator being 60kVA working at 50% load with a fuel consumption of 6 litres per hour at a price of £1.50 per litre.
Get in touch to discuss your requirements





How Did You Hear About Us:
Would you like to Hire or Buy a Hussh Po:
Enquiry:
Want to talk to an expert about the best power supply for your setup?
Call us on:
03030 310409