Case Study
Site Overview
We deployed 4 30/45 Hussh Pods for this project in the Titanic Quarter in Belfast. The Hussh Pods were used to power aviation lights overnight which is a crucial part of any construction project. The Hussh Pods operated from January through to August, until the site was on mains grid power.
The site operated on Hussh Pod battery for 69% of the time available with the generator running for the remaining 31%.
Innovation and Sustainability
This has resulted in approximately 78,386 litres of fuel being saved at a value of £117,629 with a reduction of 207,029kg of CO2 compared to when running solely on a diesel generator.
4 30/45 Hussh Pod Battery Energy Storage Units
Aviation Lights