Crewe – Hussh Pod 30/45 Case Study
Site Overview
We deployed a 30/45 Hussh Pod as the main source of power with a 40kVA generator throughout the month of June/July 2024.
The site operated on Hussh Pod battery for 92% of the time available with the generator running for the remaining 8%.
Innovation and Sustainability
The total run time of the generator in the months of June/July was 62 hours and 49 minutes, burning 312 litres of diesel in comparison to a total of 3,720 litres.
This has resulted in approximately 3,408 litres of fuel being saved at a value of £4,768 with a reduction of 8,991kg of CO2 compared to when running solely on a diesel generator.
30/45 Hussh Pod Battery Generator
1 x 40kVA Generator
4 x Cabins
Low Load
Units 1-7 Dukeries Court, Meden Side, Meden Vale, Nottinghamshire NG20 9QU
what3words
PR Powersaving Solutions Ltd T/A Power Saving Solutions – Company Number 08804234
Tel: +44 (0)3030 310409
Out of Office Tel:+44 (0)3030 310409
© Copyright Power Saving Solutions 2024 – Privacy – Terms & Conditions