Site Overview
We deployed a 30/45 Hussh Pod as the main source of power with a 100kVA generator throughout the month of March 2024.
The site operated on Hussh Pod battery for 68% of the time available with the generator running for the remaining 32%.
Innovation and Sustainability
The total run time of the generator in the month of March was 236 hours, burning 2,832 litres of diesel in comparison to a total of 8,928 litres.
This has resulted in approximately 6,084 litres of fuel being saved at a value of £9,071 with a reduction of 16,073kg of CO2 compared to when running solely on a diesel generator.
30/45 Hussh Pod Battery Generator
1 x 100kVA Generator
6 x Cabins