Site Overview

We deployed a 30/45 Hussh Pod as the main source of power with a 100kVA generator throughout the month of March 2024.

The site operated on Hussh Pod battery for 68% of the time available with the generator running for the remaining 32%.

Innovation and Sustainability

The total run time of the generator in the month of March was 236 hours, burning 2,832 litres of diesel in comparison to a total of 8,928 litres.

This has resulted in approximately 6,084 litres of fuel being saved at a value of £9,071 with a reduction of 16,073kg of CO2 compared to when running solely on a diesel generator.

Our Client Hired:

30/45 Hussh Pod Battery Generator
1 x 100kVA Generator

Powering:

6 x Cabins

6,084 Litres

Fuel Saved*

£9,071

Money Saved*

16,073kg

CO2 Reduction*
*These figures are approximate and based on the generator being 100kVA working at 50% load with a fuel consumption of 12 litres per hour at a price of £1.49 per litre.
Get in touch to discuss your requirements





How Did You Hear About Us:
Would you like to Hire or Buy a Hussh Po:
Enquiry:
Want to talk to an expert about the best power supply for your setup?
Call us on:
03030 310409