Search
Close this search box.

Cutting Your Energy Costs with the Hussh Pod 30/45: Our Top-Rated Battery Storage Unit

30-45 Hussh Pod Blog Banner

Temporary or specialised sites often face unique energy challenges, with diesel generators seen as a need for powering a whole site – however, that is far from the case.

 

When a diesel generator is in use, costs can easily skyrocket. These are primarily through rising fuel costs, inefficient energy use, and noise levels forcing sites to close at nighttime leading to difficulties in time efficiency.

A Hussh Pod solves all of these problems.

In particular, our Hussh Pod 30/45 Battery Energy Storage System has emerged as a favourite for creating a hybrid generator solution.

Dive into our comprehensive blog as we discuss our most popular BESS, the site applications it has been used on and can be used on, and whether you can utilise a Hussh Pod in your business to help you decrease your running costs.


 

1. 30/45’s on Electric Vehicle Charging

EV Charging Station

Easing the monetary strain for Electric Vehicle Charging Operators

A decade ago, Electric Vehicles would be pretty scarce, but with modern technology and charging infrastructure quickly changing and expanding – the demand for EV is proving more than ever.

Hussh Pod 30/45’s give you a perfect solution to accommodating energy costs and grid constraints:

  • Avoid expensive demand charges at peak times.
  • Provide fast charging support by reducing the strain on the grid for high capacity chargers.
  • Use the charging station completely off-grid, by using solar, wind or any renewable source to create a sustainable EV charging network.

 

2. 30/45’s in Civil Engineering & Public Works

BESS Energy for Complex Civil Engineering Projects

Projects such as roadworks and infrastructure repairs often face logistical challenges when trying to access affordable energy requirements.

Our 30/45 Hussh Pod can benefit your engineering projects:

  • Easy portability, whether that be remote or urban sites.
  • Public projects often encourage green initiatives, and battery energy storage will decrease pollution and product renewable energy – perfect for sustainability!
  • With tight budgets for local or government-led projects, Hussh Pods ensure less generator dependency equals less fuel costs.

Civil Engineering


 

3. 30/45’s in Events & Festivals

Events

Producing Sustainable Energy for Temporary Event Setups

Events organisers often require temporary power to put on a show for their project such as lighting setups, sound engineering and catering- and many immediately result in using diesel generators to support their site needs.

Our Hussh Pod 30/45 can assist you on event setups with:

  • Making sure your site operates silently, creating an optimum experience for attendees.
  • Reducing your carbon emissions, aligning local area initiatives for sustainable events.
  • Ensuring smooths operations of lighting, sound systems, and more.

 

4. 30/45’s in Telecommunications

Ensuring Reliable Power during Critical Connectivity

Telecommunication sites are reliant on an uninterruptible power supply, and with their locations often being very remote – battery energy storage is vital.

Key Benefits of using the Hussh Pod 30/45 for Telecoms:

  • Using a BESS during grid failures ensures there’s no drop-off and remains online.
  • 30/45’s are very mobile, and will not take up an abundance of space in the telecom’s set up.
  • If the load is low, Hussh Pod BESS can take over, and thus reduce your electricity costs.  
Telecoms

 

5. 30/45’s in Construction Sites

Construction

Powering Progress Without Breaking the Building Work Bank

Construction sites often require portable energy solutions to power tools, machinery, temporary cabins and offices.

Key Benefits of using BESS in Construction: 

  • Hussh Pod reduces reliance on diesel generators
  • Supports loads by peak shaving or lopping.
  • Silent operation minimises noise, allowing better conditions and no unsociable hour restrictions.

 


 

6. 30/45’s in Healthcare and Hospitals

Powering Life-Saving Facilities that need it most

With the current strain on hospital budgets and the NHS, it has never been more of a priority to maintain the running costs of hospitals and other healthcare facilities.

The Key Benefits to using a 30/45 Hussh Pod for Healthcare & Hospitals is:

  • Reducing running costs by decreasing the reliance on diesel to run healthcare facilities and alternatively use battery energy.
  • Ability to power share, by storing energy during low load times, and discharging during periods where there is high demand for power, usually during peak hospital hours.
  • The Hussh Pod BESS ensures that healthcare equipment will have a dependable back-up, and remains online.
Using Hussh Pods in Healthcare

 


 

Of course, 30/45’s aren’t the only BESS units we can provide. Depending on your business needs, you may require less or more storage. We have several different versions:

1/4|5/15|10/20|45/90|60/100|HV150|HV175 

View all our units here