Search
Close this search box.

Case Studies

We provide battery units that power a huge number of industries and help them save costs and meet emission reduction targets

30 45 Hussh Pod

The benefits and cost savings offered by our hybrid generator solutions are already being seen in organisations big and small the length and breadth of the country operating in a variety of sectors.

With Power Saving Solutions, we’ll never sell you one of our Hussh Pods until we’ve fully assessed your business needs and the operational use for which your battery power unit is intended. Once that is complete, we will then custom-build the right hybrid generator for you, taking into account the amount of power you require, battery type and whether or not you need a silent generator.

And when it comes to after-sales service, we’re just as meticulous. You can contact us around-the-clock, 365 days per year.

Gascoigne Wood

WBPS Case Study

We cross hired a Hussh Pod 5/15 to our client WB Power Service with one of their 125kVA diesel generators to a Total Tower Cranes site in Corby.

Olive Square London Case Study Hussh Pod

Olive Square Case Study

We deployed a Hussh Pod 30/45, with a 60kVA diesel generator to our client Olive Square at a site in St Johns Wood, Central London.

falcon hawkhurst case study

Falcon Case Study

We provided a Hussh Pod 30/45, with our cross hire client Falcon who deployed a 60kVA diesel generator to a site in Hawkhurst.

ABird Peckham Case Study Hussh Pod

ABird / HSS Case Study

Power Saving Solutions cross hired a Hussh Pod 30/45 with our client ABird/HSS to work alongside one of ABirds 60kVA diesel generator at a Ground construction site in Peckham.

Picture3

Murphy Group Case Study

The Hussh Pod has been configured to supply 8 x cabins with silent battery power during the nighttime and the diesel generator to supply the site with power during the day and charge the Hussh Pod’s batteries.

Gascoigne Wood

Murphy Group Case Study

We deployed a Hussh Pod 30/45 with solar panels and a wind turbine, with a 60kVA diesel generator to a site in Gascoigne Wood.